The Beckrich Road portion of the CRA is making huge strides in progress. The new side was paved this week and curb work was installed. I think we’ll be driving on it in the next couple of weeks as they redo the old side.
The groundbreaking for the Beckrich Road portion of the Front Beach Road CRA in Panama City Beach was on September 4th, 2007. Total construction time is expected to be less than 24 months. The cost of construction is around $10 million and includes Beckrich Road from Back Beach Road to Front Beach Road.

